AEG PV.630 Marine Battery User Manual


 
Protect PV.630 Installation and Start-up
8 of 21 80000047963 BAL
Transporting the Equipment
Unscrew the fan cover (optional).
Remove the fixing bolts from the transport pallet.
Insert the two transport rails (1) (optional) and use the screws
provided to screw them into the threaded bores (2) provided on
top of the cabinet at the front and back.
Attach the ropes to the transport eyelets (3) and to the crane.
Check that the transport eyelets and ropes are fastened tight.
Carefully lift the system and transport it to its installation site.
Lower the system carefully without jolting it.
Check that the system is stable.
Remove the ropes and transport eyelets.
Reattach the fan cover (optional).
3
2
2 2
2
1
3
1
1
1290
300
900
Figure 2 Using a crane to transport an assembled system with transport
rails