AEG PV.630 Marine Battery User Manual


 
Protect PV.630 Installation and Start-up
80000047963 BAL 7 of 21
i
Compliance with the requirements of IEC 60364-7-729 is
mandatory when installing the system.
Make sure that there is a space of at least 500 mm in
front of the system (ensure compliance with national re-
quirements, which may be different) when its doors are
open to ensure an escape route.
There must be a minimum clearance of 400 mm above
the system to allow air to escape.
Insufficient dissipation of waste heat can damage the
system!
Dissipate the waste heat in accordance with the manu-
facturer's specifications.
4.4 Using a Crane to Transport and Install the System
Risk of accident due to suspended loads!
Possibility of death or very serious injury.
Only trained personnel working specifically in the area
of transport may transport the system.
Secure the danger zone.
Never stand under suspended loads.
Make sure that nobody stands under suspended loads.
Wear personal protective equipment.
Preparations
Please note the following before transport:
During crane transport, only use the transport rails (1) (optional)
intended for this purpose.
Only use ropes which allow an angle of at least 45° between
rope and cabinet roof.
Do not exceed the permissible load-bearing capacity of each
rope. The load-bearing capacity must be dimensioned as fol-
lows:
Load-bearing capacity per rope 0.5 x total weight of sys-
tem or of individual components
The total weight of the system or of the individual components
is specified in the technical data sheet.
Do not exceed the permissible weight that can be carried by the
crane.
Use one rope per transport eyelet.
Be aware of the equipment's centre of gravity.
ATTENTION
WARNING