Schneider Electric PM5300 Marine Instruments User Manual


 
PowerLogic™ PM5300 series Chapter 15—MID Compliance
© 2014 Schneider Electric All Rights Reserved 109
Related topics
See “Meter mounting” on page 18 and “Meter wiring” on page 19 for additional
information.
Installing the terminal covers
The voltage and current terminal covers help prevent tampering with the meter’s
voltage and current measurement inputs. The terminal covers enclose the terminals,
the conductor fixing screws and a suitable length of the external conductors and their
insulation. The terminal covers are secured by tamper-resistant meter seals.
The meter terminal covers must be installed by a qualified installer. The installation of
both the voltage and current terminal covers is required to provide tamper evidence for
MID installations.
Location of terminal covers
1. Install the voltage terminal cover (A) and apply the seal at the sealing point (B).
2. Install the current terminal cover (C) and apply the seal at the sealing point (D).
PM5331/PM5341 default screen
The meter’s default home screen displays the following information.
A Voltage terminal cover
B Voltage terminal sealing point
C Current terminal cover
D Current terminal sealing point
A
D
C
B
Default PM5331/PM5341 display screen
A Accumulated real energy (delivered + received)
BActive tariff
C System frequency
D Power system setting
E Locked / unlocked icon
A
E
C
B
D