Mitsubishi Electronics FR-V500 Marine Battery User Manual


 
5
Structure
1.2.2 Removal and reinstallation of the operation panel
To ensure safety, remove and reinstall the operation panel after powering off.
!
Removal
Hold down the top button of the operation panel and pull the operation panel toward you to remove.
When reinstalling the operation panel, insert it straight and reinstall it securely.
! Reinstallation using the connection cable
1) Remove the operation panel.
2) Disconnect the modular jack type relay connector. (Place the disconnected modular jack type relay
connector in the modular jack type relay connector compartment.)
3) Securely plug one end of the connection cable into the PU connector of the inverter and the other end into
the operation panel. (Refer to page 18 for the connection cable.)
CAUTION
Install the operation panel only when the front cover is on the inverter.
Removal
Reinstallation
Modular jack type
relay connector
Modular jack type
relay connector compartment