Mitsubishi Electronics FR-HC2 Marine Battery User Manual


 
64
Wiring of control circuit
2.13.5 When connecting the operation panel or parameter unit using a connection cable
Having an operation panel on the enclosure surface is convenient. With a connection cable, you can mount the operation
panel (FR-DU07-CNV) or parameter unit (FR-PU07) to the enclosure surface, and connect it to the converter.
Use the option FR-CB2, or the following connector and cable available on the market.
(The operation panel (FR-DU07-CNV) requires the operation panel connection connector (FR-ADP) (option).)
Securely insert one end of connection cable into the PU connector of the high power factor converter and the other end into
the connection connector of the operation panel (FR-DU07-CNV) or the parameter unit (FR-PU07) along the guides until
the stoppers are fixed.
2.13.6 Communication operation (computer link operation)
Using the PU connector, you can perform communication operation from a personal computer, etc. When the PU connector
is connected with a personal, FA or other computer by a communication cable, a user program can monitor the converter or
read and write to parameters.
For further details, refer to page 95.
REMARKS
Refer to the following when fabricating the cable on the user side. Keep the total cable length within 20m.
Product available on the market (as of Feb. 2012)
NOTE
RS-485 terminal block and USB connector on the control circuit board cannot be used. Do not connect anything to
these.
Parameter unit connection cable
(FR-CB2)(option)
Operation panel
(FR-DU07-CNV)
Parameter unit
(FR-PU07) (option)
Operation panel connection connector
(FR-ADP)(option)
Name Model Name Manufacturer
1) Communication cable
SGLPEV-T (Cat5e/300m)
24AWG 4P
Mitsubishi Cable Industries, Ltd.
2) RJ-45 connector 5-554720-3 Tyco Electronics
HC2.book 64 ページ 2012年11月19日 月曜日 午前10時52分