Mitsubishi Electronics FR-V520-1.5K to 55K Marine Battery User Manual


 
107
Brake sequence (Pr. 60, Pr. 278 to Pr. 285)
PARAMETERS
3
(2) Operation example
At start: When the start signal is input to the inverter, the inverter starts running. When the internal speed
command reaches the value set in Pr. 278 and the output current is not less than the value set in Pr.
279, the inverter outputs the brake opening request signal (BOF) after the time set in Pr. 280 has
elapsed.
When the time set in Pr. 281 has elapsed after the brake opening completion signal (BRI) was input, the
inverter increases the internal speed command to the set speed.
At stop: When the speed has decreased to the speed set in Pr. 282, the brake opening request signal (BOF) is
turned off. When the time set in Pr. 283 has elapsed after the brake operation confirmation signal (BRI)
was input, the inverter output is switched off.
*If Pr. 60 = "8" (mechanical brake opening completion signal not input), this time is the time after the
brake opening request signal is output.
1. Pr. 60 = "7" (brake opening completion signal input)
2. Pr. 60 = "8" (mechanical brake opening completion signal not input)
STF
ON
Output I
Brake opening request
ON
Electromagnetic brake operation
Opened
Closed Closed
Tim
e
Input speed command value
Pr.280
Pr.278
Pr.13
Target speed
Pr.281
Pr.282
Pr.283
Brake opening completion
ON
Pr.279
(BOF signal)
(BRI signal)
Pr.278
STF
ON
Output I
Brake opening request
ON
OpenedClosed Closed
Tim
e
Input speed command value
Pr.280
Pr.278
Pr.13
Target speed
Pr.281
Pr.282
Pr.283
Pr.279
(BOF signal)
Electromagnetic brake
operation
Pr.278