Kawasaki STX-15F Jet Ski User Manual


 
STEERING 12-9
Handlebar
Handlebar Installation
Install the pad holder.
Apply a non-permanent locking agent to the pad holder
bolts.
Install the handlebar on the holder of the steering neck.
Apply a non-permanent locking agent to the handlebar
clamp bolts.
Align the punch mark [A] on the left side of the handlebar
with the parting line [B].
Tighten the front and then rear handlebar clamp bolts to
the specified torque.
Torque - Handlebar Clamp Bolts: 16 N·m (1.6 kgf·m, 12
ft·lb)
Be sure the pipe [A] is installed on the top end of the fuel
vent hose [B].
Install the throttle case and switch case. Tighten the
screws.
Torque - Throttle Case Mounting Screws: 3.9 N·m (0.40
kgf·m, 2.9 ft·lb)
Switch Case Mounting Screws: 3.9 N·m (0.40
kgf·m, 2.9 ft·lb)
Route the cable, wire and hose correctly (see Appendix
chapter).
Install the inner pad [A] on the handlebar, putting the
buzzer [B] into the hollow [C] on the inner pad.