GuestWorks and DEFINITY ECS Release 9
Technician Handbook for Hospitality Installations
555-231-743
Issue 1
November 2000
Installing the System
4Installation Checklist
Installation Checklist
The following is a brief checklist of the tasks required to install and translate a
hospitality solution.
Table 1. Installation Checklist
✔
Procedure
Begins
on...
Verify parts and test equipment page 5
Plan and prepare the site page 6
Unpack the equipment page 9
Install and connect the equipment page 9
Install telecommunications cabling page 10
Install the management interface page 10
Activate the systems page 12
Set up the initial options page 12
Connect and test the hospitality adjuncts page 15
Miscellaneous translations and testing page 81
Switch-to-INTUITY translations and testing page 157
INTUITY Lodging-to-PMS translations and testing page 195
Switch-to-Call Accounting translations and testing page 205
INTUITY Lodging Call Accounting-to-PMS translations and
testing
page 207
Switch-to-PMS link translations and testing page 208
Printer translations and testing page 228
Logins, security, and backups page 233
General switch testing page 237
Install and wire telephones and other equipment page 237
Test telephones and other equipment page 238
Turn the switch over to the customer page 238