GuestWorks and DEFINITY ECS Release 9
Technician Handbook for Hospitality Installations
555-231-743
Issue 1
November 2000
Translations and Testing
80Checklist
Checklist
Tab le 9 is a high-level checklist of the tasks required to translate a hospitality
solution including the switch and the INTUITY system.
!
CAUTION:
Before doing any translations, make sure that the default translation card is
in the system. Unless instructed otherwise, you must always use the default
translation card.
Table 9. Translation Checklist
✔
Procedure
Begins
on...
Initial options page 12
Miscellaneous translations and testing page 81
Switch-to-INTUITY translations and testing page 157
INTUITY Lodging-to-PMS translations and testing page 195
Switch-to-Call Accounting translations and testing page 205
INTUITY Lodging Call Accounting-to-PMS translations and
testing
page 207
Switch-to-PMS link translations and testing page 208
Journal/PMS Log and System printer translations and test-
ing
page 228
Parallel printer translations page 233
Logins, passwords, security, and backups page 233