Test the System
8-20 Issue 1 September 1995
Save Translations, if Required
If any administration changes have been made, save and make a back up copy
of the translations. See Chapter 7, "Activate the System" for detailed instructions.
Re-install Front Doors
Put the doors back on the cabinets after all the system installation and test
procedures are completed.
Next Steps
After the basic switch hardware is installed and tested, three more steps must be
completed:
1. Install telephones and other equipment
These procedures are in Chapter 9, "Install and Wire Telephones and
Other Equipment".
2. Administer features, telephones, and other equipment according to
customer data found on the provisioning plan.
The data for system and telephone features can be administered using
implementation procedures provided in the U.S. English book,
DEFINITY
Communications System Generic 3 Implementation
, (555-230-655).
3. Test telephones and other equipment.
These procedures are in Chapter 10, "Test Telephones and Other
Equipment".
NOTE:
It may be more efficient to install each hardware component,
administer it, and test it before going on to install another
component. As an example, install the attendant console using the
procedures in Chapter 9, "Install and Wire Telephones and Other
Equipment", administer it using the procedures in the book listed
above, and test it using the procedures in Chapter 8, "Test the
System".