Install and Connect the Cabinets
4-2 Issue 1 September 1995
Install Earthquake Mounting
If earthquake protection is required for your area, install earthquake floor
mounting as directed in Appendix B.
Position and Stack the Cabinets
Follow the diagram in the Customer Service Document (CSD) shipped with each
cabinet, and stack the DEFINITY System Generic 3 cabinets using these steps:
1. Place the control cabinet in position at the location determined when
room layout was planned.
NOTE:
Check location of the AC/DC power receptacle. The receptacle
must be on a separately fused circuit
not
controlled by a wall
switch. It must be located within 10 feet (3 meters) of the cabinet,
and should be located outside the cross-connect field area.
2. Stack the single-carrier cabinets by letter, according to the serial
numbers and lettered designation strips in the Customer Service
Document (CSD), and as shown in Figure 4-1.
Figure 4-1. Cabinets Stacked by Letter
3. Remove the front cabinet door and back cabinet panel. See "Unpack and
Inspect for Damage" on page 3-1 for more information.
D
B
C
A