AT&T 555-230-894 Marine Radio User Manual


 
Issue 1 September 1995 2-1
2
Plan and Prepare the Site
This chapter describes tasks required to plan, prepare, and provision the site
depending upon which DEFINITY System Generic 3 was ordered. Perform the
following:
Check the customer’s order.
Locate and lay out the equipment room.
Lay out and ensure appropriate power.
Lay out and ensure appropriate grounding.
Determine location of equipment closets.
Determine location of external trunk lines.
Create a provisioning plan.
Check the Customer’s Order
Determine what was ordered for the customer: DEFINITY System Generic 3, the
number of cabinets, port networks, management terminals, adjuncts, consoles,
telephones, modems, external trunks, etc.
NOTE:
One port network is equivalent to one single-carrier-cabinet stack.
Throughout this document, “cabinet” sometimes refers to one single-carrier
cabinet and sometimes refers to one
stack
of single-carrier cabinets,
according to the context. An attempt has been made to use “single-carrier
cabinet (SCC)” to mean exactly that and to use the more general term,
“cabinet,” to mean a stack of one or more single-carrier cabinets or a port
network. A “system” is one or more single carrier cabinet stacks.