AT&T 555-230-894 Marine Radio User Manual


 
DEFINITY System Installation Roadmap
Issue 1 September 1995
1-7
Administer the DEFINITY System According to
Customer Requirements
After the hardware is installed and the system is activated, the data for system
and telephone features must be administered, using the provisioning plan
created for this customer in Step 7 in Chapter 2, "Plan and Prepare the Site". All
steps for the administration of the system are provided in the United Kingdom
English book,
DEFINITY Communications System Generic 3 Implementation
,
555-230-655.
Test Telephones and Other Equipment
Complete this task by following the instructions provided in Chapter 10.
1. Make test calls (single-port-network switch).
2. Make test calls (two-port-network switch).
3. Make test calls (three-port-network switch).
4. Test the attendant console and selector console.
5. Test external ringing.
6. Test queue warning indicator.
7. Test integrated announcement.
8. Test music-on-hold.
9. Test emergency transfer.
10. Test remote access interface (known as INADS).
11. Test Basic Rate Interface (BRI).