Chapter 2
Installation
2-1 INTRODUCTION This chapter provides information for the initial inspection and
preparation for use of the 37xxxE Vector Network Analyzer.
Information for interfacing the 37xxxE to the IEEE-488 General
Purpose Interface Bus and reshipment and storage information is also
included.
2-2 INITIAL INSPECTION Inspect the shipping container for damage. If the container or cushion
-
ing material is damaged, retain until the contents of the shipment
have been checked against the packing list and the instrument has
been checked for mechanical and electrical operation.
If the 37xxxE is damaged mechanically, notify your local sales
representative or Anritsu Customer Service. If either the shipping
container is damaged or the cushioning material shows signs of stress,
notify the carrier as well as Anritsu. Keep the shipping materials for
the carrier’s inspection.
2-3 PREPARATION FOR USE Except for units with Option 4 (see following page), no initial setup is
required. After unpacking, the 37xxxE is ready for use. The 37xxxE is
equipped with automatic line-power sensing, and will operate with any
of the following line voltages: 100V, 120V, 220V, 240V +5%, –10%,
48–63 Hz, 350 VA. The 37xxxE is intended for Installation Category
(Overvoltage Category) II.
37xxxE OM 2-3
Use two or more people to lift and move this equipment, or use an
equipment cart. There is a risk of back injury, if this equipment is lifted
by one person.
WARNING
When supplying power to this equipment, always use a three-wire
power cable connected to a three-wire power line outlet. If power is sup
-
plied without grounding the equipment, there is a risk of receiving a se
-
vere or fatal electric shock.
WARNING